This financial model is built for an offshore heavy-lift installation contractor that owns and operates one or more purpose-built crane vessels, such as a semi-submersible heavy-lift ship or a sheerleg barge, serving offshore oil & gas and wind energy markets.
The model captures the project-based nature of the business, where revenue comes from a pipeline of discrete installation contracts, each negotiated with its own commercial terms — day rates, lump-sum milestones, mobilization fees, and standby provisions.
Vessel operations are modeled at a granular level: mobilization and demobilization transits, on-site working days interrupted by seasonal weather downtime, port calls, and dry-dock intervals. A scheduler allocates vessel availability across multiple projects, ensuring no double-booking and realistic gaps for repositioning.
Operating costs are decomposed into vessel-specific items (crew rotations, fuel and lube oil, maintenance, insurance, class and flag fees) and project-direct expenditures (port charges, levies, temporary equipment), with automatic escalation and currency differentiation.
The investment side covers build-or-buy decisions for new vessels, including pre-delivery installment payments, construction financing, and capitalised interest. Existing fleet refurbishment and fleet expansion can be phased over multiple years, with corresponding debt drawdowns and equity injections.
Tax and legal structuring options include tonnage tax regimes, income tax holidays, and cross-border withholding taxes, reflecting the operator's multicountry footprint. The model also accounts for debt service coverage ratio covenants and reserve accounts required by maritime lenders.
Altogether, the model quantifies the interplay of day-rate negotiation, weather risk, fleet utilization, and capital structure, producing dynamic project IRRs, equity returns, and long-term cash flow forecasts. The total capital investment for even a single heavy-lift vessel easily reaches the extra-large category, with the model showing the order of magnitude, not a predefined budget.