A fully integrated financial model for a scrap-based Electric Arc Furnace rebar plant, covering the entire production chain from scrap yard to finished rebar. The model is built for monthly granularity and captures the real operational dynamics of a melt shop with continuous billet casting and a high-speed rolling mill.
The melt shop section models variable metallics yield based on scrap mix quality, dressing recovery, and metallic losses. It dynamically calculates liquid steel output, billet casting yield (including tundish skull and cutting losses), and internal billet movements. The rolling mill block adds further yield loss for cobbles, grade changes, and size-dependent shearing, ensuring that plant throughput is not overstated.
Cost modeling is detailed down to individual operational drivers: EAF electrical and chemical energy per heat, electrode consumption, refractory wear, and alloy additions with grade-specific recovery rates. By-product credits from slag and mill scale are accounted for, and fixed costs are modeled with step changes for capacity utilisation levels. Scrap procurement considers multiple grades with price differentials and inventory dynamics.
Revenue is built from the product mix (diameter, grade) with a flexible price book. Working capital is driven by inventory days (raw materials, billets, finished goods), receivables, and payables. A full debt schedule with senior debt sculpting, multiple tranches, and grace periods completes the financing picture. The output includes a comprehensive set of KPIs: unlevered/levered IRR, NPV, payback, DSCR, and production-based unit costs.